Key Points

The client portal shows the schedule, milestones, and tasks, but people do the communicating.
If something isn't getting fixed, the client can call the office.
A written Project Summary Letter records the household's goals before design begins.

Has a remodeler ever gone quiet on you for a week while your kitchen sat in pieces? Here is what you hear from us and when.

You’ll learn:

  • What you hear from your team each week
  • Why the weekly meeting is already on your calendar
  • What a client portal is for, and what it isn’t
  • Who to call when something isn’t getting resolved
  • How the Project Summary Letter keeps your goals on paper
  • How we keep a remodel moving on schedule

What Will I Hear From My Remodeling Team Each Week?

Every project has a weekly meeting with you. You also get a weekly snapshot that says where the job stands and what is coming up next.

The updates start before demolition does. 1 to 2 weeks before construction, we hold a pre-construction meeting at your house, introduce you to your project manager, and go over the details of the construction process. That way you’ve met the person running your job before work starts.


Why Is the Weekly Meeting Already on My Calendar?

Three people at a table in a wallpapered room reviewing a floor plan on a screen

The meeting stays on your calendar every week, from design to the end of the job, and only you can cancel it.

Say a question comes up. Because the meeting is already scheduled, you can bring it to that week’s meeting.


Can a Client Portal Replace a Phone Call?

A portal can’t replace a phone call, and it isn’t meant to. Your portal shows the schedule, the milestones, and the tasks, so you can check where things stand on your own time. It’s a record-keeping tool. Our process is driven by people, not by software.

Use the portal to check the schedule. Bring your questions to your weekly meeting or to your project manager.


Who Do I Call If Something Isn’t Getting Resolved?

Showroom entry with a stone wall company sign, a wood desk, and a rotary phone

No remodel goes perfectly. If something isn’t getting resolved, call us at (678) 540-1114.


How Does a Written Project Summary Letter Keep Everyone on the Same Page?

Two people reviewing hardware, cabinet doors, and tile samples on a white island

It puts your goals on paper before design begins. The Project Summary Letter records your household’s needs, your goals, and the objectives and background of the project, along with the first concepts we’re considering. We review it together with you at your visit to our Roswell showroom.

When your architectural designer walks your house with you, the designer brings the letter and works from it, along with any notes and concepts that have come up since. That visit comes about 1 to 1.5 weeks after we document the existing conditions of your home.


How Do You Keep a Remodel on Schedule?

We get the permits before construction starts. Licensed contractors in Georgia are required to get the building permits before work begins, and we handle that for you.

We also order long-lead items, such as cabinets, windows, doors, and fixtures, early and store them in our warehouse to keep the build moving. How long a job takes depends on its size and tier. For a whole-home remodeling project, our timelines run 10 or more weeks for a tier 1 project, 12 or more for tier 2, and 16 or more for tier 3.

Whole-home project tierTimeline
Tier 110 or more weeks
Tier 212 or more weeks
Tier 316 or more weeks

Want to See What a Remodel With Ranney Blair Weidmann Looks Like?

To see more of how a remodel with us works, take a look at what the remodel experience looks like, or call us at (678) 540-1114. Our remodeling design process is where the weekly meetings begin.

Frequently Asked Questions

Can I live in my house during the remodel?

For a kitchen remodel, you can stay in the house, though we recommend moving out. On one project that covered a kitchen, a primary suite, and a laundry, the family stayed in the house. We built framed walls around the work area with a door that locks, which helps if you have small children, and we ran fans so dust wasn't pushed into the rest of the home. We minimize dust, but there will still be some in other areas. For a whole-home remodel, you'll need to move out. There's more in our post on living in your home during a renovation.

What happens at the end of the project?

We do a punch-list walkthrough with you, and one of the owners comes out to check the work before we call the job done. Then one of the owners holds an exit interview with you. We walk through the project to make sure the quality meets our standards, and we ask what we did well, what we need to improve, and whether we earned your recommendation.

What happens before construction starts?

First, you pick the items that take the longest to arrive, like cabinets and windows, with your designer. Then we finish the build plans, you sign the Remodeling Agreement, and you pay the initial construction deposit. We get the building permits, order materials to our warehouse, and assign your project manager.

Read More From Ranney Blair Weidmann